Well Nemetona is up at Pittwater now. Grant and myself took her up there on Monday the public Holiday. The sail up there was a good one. SW winds 10 - 15 knots about 1m following swell. Arrived at Bayview and parked her safely. the trip in total took about 5.5 hrs. All I can do now is wait and not bother the work men to much. I have listed the items below that we are getting done.
- Water maker
- SS davits at the rear to hold Tender
- Radar
- Sink and stove infills to create more bench space
- Access door under main table for storage
- 3 extra batteries/ Total now 8 house 1 engine 2 winch and windless
- 2 new solar panels/ total now 4
- Replace hatches: warranty
- Repair timber work in forward head : warranty
- Mount life raft under Stern seating
- Check ducted heating systems as is faulty
Hopefully I will get to Pittwater next week to see how things are progressing, and not intrude to much on the work that is being carried out. I think that she will be up there in total for about 3 weeks maximum but hopefully it will be less.